Gas Liquids Engineering Ltd. (GLE) provided EPCM services for the installation of a booster compressor for Iteration Energy’s North Boundary 06-35-87-15-W6M wellsite. Project scope included:
- Installation of an AJAX 300 Booster Compressor on a gravel pad
- Removal of an existing Dehydrator Unit and replacing with an 8” RJV Separator Package
- Installation of 24” Inlet Separator to catch pipeline slugs prior to entering AJAX 300 Booster Compressor