Rio Alta Exploration Ltd. – Galloway Gas Processing Facility Expansion

Gas Liquids Engineering Ltd. (GLE) provided complete EPCM services for a 75 MMSCF/d sweet gas expansion to an existing 20 MMSCF/d sour gas facility. Project scope included:

  • Two (2) 110,000 gallon LPG bullets
  • Inlet Compression
  • Designed for 3 x 3300 hp. 2 x 3300 hp installed, with additional 3300 hp installed in a later year
  • Large Inlet slug catcher
  • Stabilization System
  • Compression Refrigeration plant
  • Flare system