Gas Liquids Engineering Ltd. (GLE) provided complete EPCM services for the Cypress C wellsite for Talisman. Installed equipment included:
- One (1) Wellhead
- Inlet Separator Skid
- Compressor Skid
- Dehydration Skid
- Chemical Injection Skid
- RTU Skid
- Radio Tower
- Fuel Gas Meter
- 4” 40’ Flare Stack
- 35 kW Diesel Generator – 240 V 1-Phase @ 60 Hz
- 1000 US Gallon Lube Oil Tank
- 400 bbl Storage Tank
- 50 bbl FKOD
Provisions were made for the following future equipment:
- Two (2) Additional Wellheads
- Sand Filter
- P-Tank
- Cooler
- Condensate Tank